More Southshore road closures planned

KOLOA — Multiple sections of Koloa and Maluhia roads are scheduled for lane closures from Monday through Friday, May 24 to 28.

Multiple sections of Koloa Road will be under a single-lane closure for shoulder construction, pavement work and striping operations from 7 a.m. to 6 p.m. Portions of Maluhia Road will also be under short lane closures for inspection and punch-list-completion work from 7 a.m. to 6 p.m.

As a reminder, ‘Oma‘o Road is a narrow residential road that is not intended to be used as a detour route and not designed for high volumes of traffic or truck traffic.

The speed limit is 25 mph for the entire length the road. Through trucks are prohibited on ‘Oma‘o Road for the duration of this project. Eastbound motorists from the Westside, Kalaheo and Lawa‘i are recommended to take Kaumuali‘i Highway to Maluhia Road to access Koloa and Po‘ipu.

0 Comments

Your email address will not be published. Required fields are marked *

*

By participating in online discussions you acknowledge that you have agreed to the TERMS OF SERVICE. An insightful discussion of ideas and viewpoints is encouraged, but comments must be civil and in good taste, with no personal attacks. If your comments are inappropriate, you may be banned from posting. To report comments that you believe do not follow our guidelines, send us an email.