Sewer system inspection work starting Dec. 8

LIHU‘E — The public is advised that the Department of Public Works Wastewater Management Division’s contractor will be performing closed-circuit television (CCTV) inspections on the Lihu‘e sewer collection system from Dec. 8 to Dec. 15.

Sewer manholes will be used to access the sewer line and deploy the camera. It is anticipated that the contractor will be at a manhole between one and four hours. The purpose of the inspections is to assess the condition of the sewer lines and manholes in the area.

The inspections will be performed in the Lihu‘e Gardens subdivision units 1, 2, and 3. Inspections will also be performed on the following roads: Umi Street, Hardy Street, Rice Street, Aukele Street, and Peleke Street. The inspections will be performed during the daytime, between 7:30 a.m. and 4:30 p.m.

Traffic control, using flaggers, will be implemented in the work areas.

Motorists should drive with caution, expect delays, and adjust their travel times as needed.

Anyone with questions may contact Donn Kakuda with the Department of Public Works, Wastewater Management Division at 808-241-4084 or dkakuda@kauai.gov.

0 Comments

Your email address will not be published. Required fields are marked *

*

By participating in online discussions you acknowledge that you have agreed to the TERMS OF SERVICE. An insightful discussion of ideas and viewpoints is encouraged, but comments must be civil and in good taste, with no personal attacks. If your comments are inappropriate, you may be banned from posting. To report comments that you believe do not follow our guidelines, send us an email.